MEASURE: High efficiency replacement warm-air units
Replacement of existing warm air system with a high efficiency warm air unit system
Monitoring & feedback recommended: Yes
ADVANTAGES
increased efficiency over previous warm air unit
CONCERNS & ACTIONS
TECHNICAL (6)
RELATED MEASURES
SERVICES (20)
Heating system Refurbishment
Air source heat pumps
Ground/Water source heat pumps
Biomass boilers
Biomass stove with back boiler
Solar water heating
Cylinder thermostats
Hot water cylinder insulation
New cylinder
Heating controls (for wet and warm air systems)
Heating Distribution Refurbishment
Pipe insulation
Background ventilators and intermittent extract fans
Passive stack ventilation
Continuous mechanical extract ventilation
Continuous mechanical supply and extract ventilation with heat recovery
Passive stack ventilation with heat recovery
Passive stack ventilation with demand control ventilation
Continuous mechanical extract ventilation with demand control ventilation
Continuous mechanical supply and extract ventilation with heat recovery and with demand control ventilation
Air source heat pumps
Ground/Water source heat pumps
Biomass boilers
Biomass stove with back boiler
Solar water heating
Cylinder thermostats
Hot water cylinder insulation
New cylinder
Heating controls (for wet and warm air systems)
Heating Distribution Refurbishment
Pipe insulation
Background ventilators and intermittent extract fans
Passive stack ventilation
Continuous mechanical extract ventilation
Continuous mechanical supply and extract ventilation with heat recovery
Passive stack ventilation with heat recovery
Passive stack ventilation with demand control ventilation
Continuous mechanical extract ventilation with demand control ventilation
Continuous mechanical supply and extract ventilation with heat recovery and with demand control ventilation