Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; JPB_User_Caps has a deprecated constructor in /var/www/vhosts/responsible-retrofit.org/httpdocs/wp-content/plugins/stba/stba.php on line 335
Measure | STBA

MEASURE: Floor void filled with insulation

After cutting back of suspended timber ground floor joists from external walls and closing airbricks; the entire void is filled with insulation, usually EPS beads.

Monitoring & feedback recommended: Yes

ADVANTAGES

Significant heat-loss reduction and increased thermal comfort

CONCERNS & ACTIONS

RELATED MEASURES